On-site construction management using mobile computing technology C Kim, T Park, H Lim, H Kim Automation in construction 35, 415-423, 2013 | 225 | 2013 |
4D CAD model updating using image processing-based construction progress monitoring C Kim, B Kim, H Kim Automation in Construction 35, 44-52, 2013 | 162 | 2013 |
Object recognition in construction-site images using 3D CAD-based filtering Y Wu, H Kim, C Kim, SH Han Journal of Computing in Civil Engineering 24 (1), 56-64, 2010 | 84 | 2010 |
Developing a technology roadmap for construction R&D through interdisciplinary research efforts C Kim, H Kim, SH Han, C Kim, MK Kim, SH Park Automation in Construction 18 (3), 330-337, 2009 | 82 | 2009 |
3D/4D CAD applicability for life-cycle facility management J Park, B Kim, C Kim, H Kim Journal of computing in civil engineering 25 (2), 129-138, 2011 | 71 | 2011 |
Interactive Modeler for Construction Equipment Operation Using Augmented Reality B Kim, C Kim, H Kim Journal of Computing in Civil Engineering 26 (3), 331-341, 2012 | 64 | 2012 |
Automatic fault recognition of photovoltaic modules based on statistical analysis of UAV thermography D Kim, J Youn, C Kim The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2017 | 58 | 2017 |
Ubiquitous sensor network for construction material monitoring C Kim, H Kim, J Ryu, C Kim Journal of Construction Engineering and Management 137 (2), 158-165, 2011 | 52 | 2011 |
Applicability of 4D CAD in civil engineering construction: Case study of a cable-stayed bridge project C Kim, H Kim, T Park, MK Kim Journal of Computing in Civil Engineering 25 (1), 98-107, 2011 | 51 | 2011 |
Valuation of drainage infrastructure improvement under climate change using real options T Park, C Kim, H Kim Water resources management 28, 445-457, 2014 | 36 | 2014 |
Automatic photovoltaic panel area extraction from UAV thermal infrared images D Kim, J Youn, C Kim Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and …, 2016 | 35 | 2016 |
RFID and CCTV-based material delivery monitoring for cable-stayed bridge construction Y Ju, C Kim, H Kim Journal of computing in civil engineering 26 (2), 183-190, 2012 | 34 | 2012 |
Determining the optimal installation timing of building integrated photovoltaic systems B Kim, K Kim, C Kim Journal of cleaner production 140, 1322-1329, 2017 | 29 | 2017 |
A real option-based model to valuate CDM projects under uncertain energy policies for emission trading T Park, C Kim, H Kim Applied energy 131, 288-296, 2014 | 28 | 2014 |
Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction T Park, MK Kim, C Kim, H Kim Journal of Construction Engineering and Management 135 (11), 1261-1270, 2009 | 26 | 2009 |
Knowledge-based approach for 3D reconstruction of as-built industrial plant models from laser-scan data C Kim, H Son ISARC 2013-30th International Symposium on Automation and Robotics in …, 2013 | 25 | 2013 |
Is it a good time to develop commercial photovoltaic systems on farmland? An American-style option with crop price risk B Kim, C Kim, SU Han, JH Bae, J Jung Renewable and Sustainable Energy Reviews 125, 109827, 2020 | 17 | 2020 |
Data management framework of drone-based 3D model reconstruction of disaster site C Kim, H Moon, W Lee The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2016 | 16 | 2016 |
BIM-based mobile system for facility management H Kim, C Kim, H Lim, H Kim 30th International Symposium on Automation and Robotics in Construction and …, 2013 | 15 | 2013 |
A uav based 3-d positioning framework for detecting locations of buried persons in collapsed disaster area H Moon, C Kim, W Lee The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2016 | 14 | 2016 |